Queue requests in study in Pennsylvania (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown20739 MW
Active in queue2,086 MW47 requests
Agreement signed1,347 MW27 requests
Withdrawn1238,524 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

20 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Erie East Energy
Battery storage
160 MWPaused / redesign Erie, PAPJM Mar 2019target 2026
Shorebird Solar
Solar
117 MWPaused / redesign Crawford, PAPJM Mar 2019target 2025
Granite Hill Solar
Solar
70.0 MWPaused / redesign Adams, PAPJM Mar 2019target 2026
Dover Solar
Solar
55.0 MWPaused / redesign York, PAPJM Mar 2019target 2026
Maple Hill-Fiddlers 1 SP (Bear Rock)
Solar Β· CPV Maple Hill Solar, LLC
50.0 MWIn study Cambria, PAPJM Dec 2019target 2021
Cottontail Solar 7
Solar
35.0 MWPaused / redesign Columbia, PAPJM Sep 2019target 2028
Momentum Gratz
Battery storage
20.0 MWPaused / redesign Dauphin, PAPJM Jun 2019target 2024
Mountain Holly
Solar
20.0 MWPaused / redesign Columbia, PAPJM Mar 2019target 2027
HU-Pauls
Solar
20.0 MWPaused / redesign Huntingdon, PAPJM Mar 2019target 2027
Montour 1
Solar
20.0 MWPaused / redesign Columbia, PAPJM Mar 2019target 2025
Dover Solar
Solar
20.0 MWPaused / redesign York, PAPJM Jul 2019target 2026
HU-Logging
Solar
20.0 MWPaused / redesign Huntingdon, PAPJM Feb 2019target 2024
SunEast Hooversville Solar
Solar
20.0 MWPaused / redesign Somerset, PAPJM Oct 2019target 2026
SunEast Hooversville Solar
Solar
20.0 MWPaused / redesign Somerset, PAPJM Sep 2019target 2026
Jakes Hollow Solar
Solar
20.0 MWPaused / redesign Elk, PAPJM Sep 2019target 2027
G Morris Solar
Solar
17.0 MWPaused / redesign Dauphin, PAPJM Sep 2019target 2026
Ce-Filmore
Solar
16.0 MWPaused / redesign Centre, PAPJM Mar 2019target 2027
FU-Hanks Solar
Solar
15.7 MWPaused / redesign Fulton, PAPJM Sep 2019target 2026
CL-Route 58 B
Solar
13.5 MWPaused / redesign Clarion, PAPJM Sep 2019target 2026
SunEast Hooversville Solar
Solar
10.0 MWPaused / redesign Somerset, PAPJM Oct 2019target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)