OCTARY USA Β· INTERCONNECTION QUEUESQueue requests in study in Pennsylvania (2019 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Erie East Energy Battery storage |
160 MW | Paused / redesign |
| Shorebird Solar Solar |
117 MW | Paused / redesign |
| Granite Hill Solar Solar |
70.0 MW | Paused / redesign |
| Dover Solar Solar |
55.0 MW | Paused / redesign |
| Maple Hill-Fiddlers 1 SP (Bear Rock) Solar Β· CPV Maple Hill Solar, LLC |
50.0 MW | In study |
| Cottontail Solar 7 Solar |
35.0 MW | Paused / redesign |
| Momentum Gratz Battery storage |
20.0 MW | Paused / redesign |
| Mountain Holly Solar |
20.0 MW | Paused / redesign |
| HU-Pauls Solar |
20.0 MW | Paused / redesign |
| Montour 1 Solar |
20.0 MW | Paused / redesign |
| Dover Solar Solar |
20.0 MW | Paused / redesign |
| HU-Logging Solar |
20.0 MW | Paused / redesign |
| SunEast Hooversville Solar Solar |
20.0 MW | Paused / redesign |
| SunEast Hooversville Solar Solar |
20.0 MW | Paused / redesign |
| Jakes Hollow Solar Solar |
20.0 MW | Paused / redesign |
| G Morris Solar Solar |
17.0 MW | Paused / redesign |
| Ce-Filmore Solar |
16.0 MW | Paused / redesign |
| FU-Hanks Solar Solar |
15.7 MW | Paused / redesign |
| CL-Route 58 B Solar |
13.5 MW | Paused / redesign |
| SunEast Hooversville Solar Solar |
10.0 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)