United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Pennsylvania (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Shawville Generating Station Gas |
590 MW | |
| Hilltop Energy Center Facility Gas |
515 MW | |
| Birdsboro Power LLC Generation Facility Gas |
450 MW | |
| Sunbury Generation Facility Gas |
97.0 MW | |
| Fayette Energy Facility Gas |
45.0 MW | |
| Smithton Generating Station Gas |
40.0 MW | |
| Liberty Electric Gas |
35.0 MW | |
| St. Thomas Township Solar Facility II Solar |
20.0 MW | |
| Hilltop Energy Center Facility Gas |
20.0 MW | |
| St. Thomas Township Solar Facility Solar |
20.0 MW | |
| Big Level Wind Farm Onshore wind |
20.0 MW | |
| Wyalusing 34.5kV Gas |
19.9 MW | |
| Morris Road Other |
4.1 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)