United States βΊ Grid βΊ Interconnection queues βΊ Oregon
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Oregon (2012 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project G0478, Morrow County Solar + storage |
500 MW | In study |
| Battery storage project 12-052, Marion County Battery storage |
100 MW | Paused / redesign |
| Battery storage project 12-054, Clackamas County Battery storage |
100 MW | Paused / redesign |
| Onshore wind project 12-053, Polk County Onshore wind |
87.5 MW | Paused / redesign |
| Gas project 12-049, Morrow County Gas |
75.0 MW | Paused / redesign |
| Coal project 12-047, Morrow County Coal |
44.0 MW | Paused / redesign |
| Solar project 443, Crook County Solar Β· Ponderosa Solar, LLC |
34.6 MW | Agreement signed |
| Gas project 12-048, Morrow County Gas |
30.0 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)