United States β€Ί Grid β€Ί Interconnection queues β€Ί Oregon

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Oregon (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown72,290 MW
Active in queue2,504 MW14 requests
Agreement signed214 MW7 requests
Withdrawn422,820 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project G0615, Sherman County
Solar + storage
1,200 MWIn study Sherman, ORWest Feb 2019target 2021
Onshore wind project G0619, Wasco County
Onshore wind
500 MWIn study Wasco, ORWest Apr 2019target 2023
Solar + storage project G0617, Sherman County
Solar + storage
300 MWIn study Sherman, ORWest Mar 2019target 2022
Solar project G0625, Morrow County
Solar
191 MWIn study Morrow, ORWest Jun 2019target 2020
Solar + storage project 562, Malheur County
Solar + storage Β· Moores Hollow PV1, LLC
42.0 MWPaused / redesign Malheur, ORWest Aug 2019target 2024
Solar + storage project 556, Grant County
Solar + storage Β· Prairie City PV1, LLC
30.0 MWPaused / redesign Grant, ORWest Apr 2019target 2024
Gas project G0620, Umatilla County
Gas
27.0 MWIn study Umatilla, ORWest Apr 2019target 2019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)