United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Ohio (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4496 MW
Active in queue3,146 MW26 requests
Agreement signed2,650 MW22 requests
Withdrawn576,262 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Butterfly Meadows
Solar Β· Butterfly Meadows Solar Project, LLC
300 MWIn study Van Wert, OHPJM Sep 2020target 2024
Butterfly Meadows
Battery storage Β· Butterfly Meadows Solar Project, LLC
100 MWIn study Van Wert, OHPJM Sep 2020target 2024
Paulding Storage II
Battery storage Β· Paulding Wind Farm II LLC
50.0 MWIn study Paulding, OHPJM Mar 2020target 2023
South Branch Solar
Solar
46.0 MWPaused / redesign Hancock, OHPJM Jul 2020target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)