Completed queue projects in Ohio (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7100 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn424,729 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Troy Energy
Gas
40.0 MWOperating Wood, OHPJM Apr 20102014
Lorain
Other
19.2 MWOperating Lorain, OHPJM Nov 20102012
Hog Creek Wind Farm
Onshore wind
18.4 MWOperating Hardin, OHPJM Mar 20102017
Perry Nuclear Power Plant
Nuclear
16.0 MWOperating Lake, OHPJM Nov 20102013
Carbon Limestone Landfil Gas to Electricity Facility
Other
3.2 MWOperating Mahoning, OHPJM Nov 20102012
Solar project V4-073, Montgomery County
Solar
2.5 MWOperating Montgomery, OHPJM Jan 20102010
Zanesville Energy
Other
0.9 MWOperating Muskingum, OHPJM Sep 20102011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)