United States β€Ί Grid β€Ί Interconnection queues β€Ί North Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in North Carolina (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7344 MW
Active in queue425 MW5 requests
Agreement signed350 MW4 requests
Withdrawn263,153 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Moccasin Creek Solar
Solar
100 MWOperating Edgecombe, NCPJM Mar 20162020
Wilkinson Solar Energy Center
Solar
74.0 MWOperating Hyde, NCPJM Apr 20162019
Hawtree Creek
Solar
65.0 MWOperating Warren, NCPJM Aug 20162021
American Beech Solar
Solar
60.0 MWOperating Alamance, NCPJM Oct 20162025
American Beech Solar
Solar
20.0 MWOperating Alamance, NCPJM Oct 20162025
Elizabeth City Solar
Solar
20.0 MWOperating Camden, NCPJM Feb 20162021
Colice Hall Solar
Solar
5.0 MWOperating Hertford, NCPJM Apr 20162023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)