United States › Grid › Interconnection queues › North Carolina
SOLAR · PJMWilkinson Solar Energy Center
Wilkinson Solar Energy Center is a 74.0 MW solar request built and operating in the PJM interconnection queue, in Hyde County, North Carolina, connecting to Dominion.
Request details
- Queue ID
- AB2-169
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Pantago-Five Points 115kV
- Location
- Hyde County, North Carolina
- Technology
- Solar: 74.0 MW
- Total requested
- 74.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Operational
- Entered queue
- 29 April 2016
- Agreement signed
- 4 March 2020
- Proposed online date
- June 2021
- Came online
- November 2019
Location
Marker shows the centre of Hyde County; the queue data does not give exact sites.
Power plants in North Carolina · Transmission lines in North Carolina
Other requests in Hyde County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem