Completed queue projects in North Carolina (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9995 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn221,741 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 8598, Buncombe County
Gas Β· Duke Energy Progress, LLC
280 MWOperating Buncombe, NCSoutheast Dec 20152019
Gas project 8597, Buncombe County
Gas Β· Duke Energy Progress, LLC
280 MWOperating Buncombe, NCSoutheast Dec 20152019
Oak Solar
Solar
120 MWOperating Northampton, NCPJM Nov 20152024
Ablemarle Beach Solar
Solar
80.0 MWOperating Washington, NCPJM Apr 20152020
Harts Mill Solar
Solar
80.0 MWOperating Edgecombe, NCPJM Sep 20152020
Gutenberg Solar
Solar
74.9 MWOperating Northampton, NCPJM Feb 20152019
Chestnut Solar
Solar
66.0 MWOperating Halifax, NCPJM Feb 20152019
Chestnut Solar
Solar
8.9 MWOperating Halifax, NCPJM Apr 20152019
Gutenberg Solar
Solar
5.0 MWOperating Northampton, NCPJM Apr 20152019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)