United States βΊ Grid βΊ Interconnection queues βΊ Nevada
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Nevada (2014 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Boulder Solar 3 (Fka: Boulder Solar Power C7) Solar |
250 MW | Withdrawn / abandoned |
| Onshore wind project Company GA, Elko County Onshore wind |
200 MW | Withdrawn / abandoned |
| Spring Mountain Solar Solar |
100 MW | Withdrawn / abandoned |
| Solar project Company 136, Clark County Solar |
100 MW | Withdrawn / abandoned |
| Solar project Company 137, Clark County Solar |
100 MW | Withdrawn / abandoned |
| Solar project Company 131, Clark County Solar |
100 MW | Withdrawn / abandoned |
| Solar project Company 132, Clark County Solar |
80.0 MW | Withdrawn / abandoned |
| Sunshine Valley Solar 3 Solar |
65.0 MW | Withdrawn / abandoned |
| Solar project Company 135, Clark County Solar |
50.0 MW | Withdrawn / abandoned |
| Roadrunner Solar |
50.0 MW | Withdrawn / abandoned |
| Caballo Loco Solar |
50.0 MW | Withdrawn / abandoned |
| Solar project Company 134, Clark County Solar |
50.0 MW | Withdrawn / abandoned |
| Solar project Company 130, Clark County Solar |
30.0 MW | Withdrawn / abandoned |
| Dixie Valley 2 Geothermal |
5.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)