United States βΊ Grid βΊ Interconnection queues βΊ Nevada
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Nevada (2011 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Hidden Hills Ranch Solar |
540 MW | Withdrawn / abandoned |
| Sandy Valley Phase I Segs (Fka Pahrump Valley Segs) Solar |
270 MW | Withdrawn / abandoned |
| Other project Company FK, White Pine County Other |
200 MW | Withdrawn / abandoned |
| Solar project Company 110, Clark County Solar |
150 MW | Withdrawn / abandoned |
| Solar project Company 113, Clark County Solar |
150 MW | Withdrawn / abandoned |
| Solar project Company 102, Clark County Solar |
100 MW | Withdrawn / abandoned |
| Onshore wind project Company 105, Clark County Onshore wind |
85.5 MW | Withdrawn / abandoned |
| Coyote Canyon Geothermal |
70.0 MW | Withdrawn / abandoned |
| Solar project Company 111, Clark County Solar |
50.0 MW | Withdrawn / abandoned |
| Dixie-Comstock Geothermal Project Geothermal |
38.0 MW | Withdrawn / abandoned |
| Edwards Creek Geothermal Project Geothermal |
38.0 MW | Withdrawn / abandoned |
| Tungsten Mountain Geothermal Project Geothermal |
38.0 MW | Withdrawn / abandoned |
| Deadhorse Wells Geothermal Project Geothermal |
27.0 MW | Withdrawn / abandoned |
| Solar project Company 100, Clark County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project Company 103, Clark County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project Company 104, Clark County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project Company 101, Clark County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project Company 112, Clark County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project Company 109, Clark County Solar |
15.0 MW | Withdrawn / abandoned |
| Solar project Company 107, Clark County Solar |
10.0 MW | Withdrawn / abandoned |
| Solar project Company 108, Clark County Solar |
10.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)