United States β€Ί Grid β€Ί Interconnection queues β€Ί Nebraska

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Nebraska (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown81,091 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn81,091 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project GEN-2015-042, Dixon County
Onshore wind
320 MWWithdrawn / abandoned Dixon, NESPP Oct 2015target 2017
Onshore wind project GEN-2015-076, Cedar County
Onshore wind
158 MWWithdrawn / abandoned Cedar, NESPP Sep 20152020
Onshore wind project GEN-2015-094, Banner County
Onshore wind
152 MWWithdrawn / abandoned Banner, NESPP Oct 2015target 2017
Onshore wind project GEN-2015-008, Antelope County
Onshore wind
150 MWWithdrawn / abandoned Antelope, NESPP Mar 2015target 2016
Onshore wind project GEN-2015-100, Jefferson County
Onshore wind
120 MWWithdrawn / abandoned Jefferson, NESPP Dec 2015target 2020
Onshore wind project GEN-2015-054, Antelope County
Onshore wind
74.0 MWWithdrawn / abandoned Antelope, NESPP Oct 2015target 2017
Onshore wind project GEN-2015-087, Thayer County
Onshore wind
66.0 MWWithdrawn / abandoned Thayer, NESPP Sep 20152019
Onshore wind project GEN-2015-053, Antelope County
Onshore wind
50.0 MWWithdrawn / abandoned Antelope, NESPP Oct 2015target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)