United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Montana (2022 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown92,350 MW
Active in queue2,350 MW9 requests
Agreement signed0.0 MW0 requests
Withdrawn153,952 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project 435, Rosebud County
Solar + storage
800 MWIn study Rosebud, MTWest Nov 2022target 2025
Onshore wind project 418, Wheatland County
Onshore wind
750 MWIn study Wheatland, MTWest Jan 2022target 2026
Solar project 419, Big Horn County
Solar
300 MWIn study Big Horn, MTWest Feb 2022target 2025
Solar + storage project 421, Stillwater County
Solar + storage
200 MWPaused / redesign Stillwater, MTWest Feb 2022target 2025
Hydro project 437, Cascade County
Hydro
70.0 MWIn study Cascade, MTWest Dec 2022
Solar + storage project 433, Stillwater County
Solar + storage
65.0 MWIn study Stillwater, MTWest Sep 2022target 2025
Solar + storage project 434, Stillwater County
Solar + storage
65.0 MWIn study Stillwater, MTWest Sep 2022target 2025
Solar + storage project 432, Wheatland County
Solar + storage
50.0 MWIn study Wheatland, MTWest Sep 2022target 2025
Solar + storage project 431, Wheatland County
Solar + storage
50.0 MWIn study Wheatland, MTWest Sep 2022target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)