United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Montana (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown31,026 MW
Active in queue1,026 MW3 requests
Agreement signed0.0 MW0 requests
Withdrawn232,130 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project G0566, Lincoln County
Hydro
646 MWIn study Lincoln, MTWest Jun 2017target 2022
Solar + storage project 311, Yellowstone County
Solar + storage
300 MWIn study Yellowstone, MTWest Feb 2017target 2021
Wind + storage project 335, Wheatland County
Wind + storage
80.0 MWPaused / redesign Wheatland, MTWest Sep 2017target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)