United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Missouri (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown61,227 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn61,227 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project J115, St. Francois County
Onshore wind
500 MWWithdrawn / abandoned St. Francois, MOMISO Feb 2010target 2012
Onshore wind project GEN-2010-031, Atchison County
Onshore wind
200 MWWithdrawn / abandoned Atchison, MOSPP Jun 2010target 2014
Onshore wind project J168, Dekalb County
Onshore wind
200 MWWithdrawn / abandoned Dekalb, MOMISO Sep 2010target 2010
Onshore wind project GEN-2010-056, Holt County
Onshore wind
151 MWWithdrawn / abandoned Holt, MOSPP Oct 2010target 2012
Onshore wind project J113, Atchison County
Onshore wind
101 MWWithdrawn / abandoned Atchison, MOMISO Feb 2010target 2012
Onshore wind project GEN-2010-022, Cass County
Onshore wind
75.0 MWWithdrawn / abandoned Cass, MOSPP Mar 2010target 2012

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)