United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Mississippi (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown102,203 MW
Active in queue2,203 MW10 requests
Agreement signed200 MW1 requests
Withdrawn182,951 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

10 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project J2173, Hinds County
Solar + storage
396 MWIn study Hinds, MSMISO Aug 2021target 2027
Solar + storage project J1946, Jasper County
Solar + storage
350 MWIn study Jasper, MSMISO Aug 2021target 2024
Solar project IC-986, Lamar County
Solar
250 MWPaused / redesign Lamar, MSSoutheast Oct 2021target 2025
Solar project J2289, Sunflower County
Solar
200 MWIn study Sunflower, MSMISO Sep 2021target 2028
Solar + storage project J1891, Attala County
Solar + storage
200 MWIn study Attala, MSMISO Aug 2021target 2027
Solar project 466, Clay County
Solar
200 MWAgreement signed Clay, MSSoutheast Feb 2021target 2028
Solar project J2047, Desoto County
Solar
199 MWIn study Desoto, MSMISO Aug 2021target 2024
Solar + storage project J2127, Jefferson Davis County
Solar + storage
173 MWIn study Jefferson Davis, MSMISO Aug 2021target 2027
Solar project J2287, Bolivar County
Solar
135 MWIn study Bolivar, MSMISO Sep 2021target 2024
Solar project J2297, Sunflower County
Solar
100 MWIn study Sunflower, MSMISO Sep 2021target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)