United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

OCTARY USA Β· INTERCONNECTION QUEUES

Projects with signed interconnection agreements in Mississippi (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3212 MW
Active in queue512 MW5 requests
Agreement signed212 MW3 requests
Withdrawn8882 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 313, Monroe County
Solar
100 MWAgreement signed Monroe, MSSoutheast May 2017target 2026
Solar project 314, Monroe County
Solar
60.0 MWAgreement signed Monroe, MSSoutheast May 2017target 2021
Solar project J791, Lamar County
Solar
52.0 MWAgreement signed Lamar, MSMISO Apr 2017target 2020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)