Withdrawn queue requests in Minnesota (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5359 MW
Active in queue96.9 MW2 requests
Agreement signed96.9 MW2 requests
Withdrawn5359 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project J441, Dodge County
Onshore wind
170 MWWithdrawn / abandoned Dodge, MNMISO Apr 2015target 2019
Onshore wind project J520, Pipestone County
Onshore wind
100 MWWithdrawn / abandoned Pipestone, MNMISO Nov 2015target 2017
Solar project J525, Murray County
Solar
50.0 MWWithdrawn / abandoned Murray, MNMISO Nov 2015target 2017
Battery storage project J522, Mower County
Battery storage
20.0 MWWithdrawn / abandoned Mower, MNMISO Nov 2015target 2019
Onshore wind project J454, Lyon County
Onshore wind
18.9 MWWithdrawn / abandoned Lyon, MNMISO May 2015target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)