United States βΊ Grid βΊ Interconnection queues βΊ Michigan
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Michigan (2014 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project J353, Dickinson County Gas |
725 MW | Withdrawn / abandoned |
| Gas project J352, Dickinson County Gas |
362 MW | Withdrawn / abandoned |
| Gas project J394, Marquette County Gas |
327 MW | Withdrawn / abandoned |
| Gas project J413, Marquette County Gas |
243 MW | Withdrawn / abandoned |
| Gas project J398, Marquette County Gas |
204 MW | Withdrawn / abandoned |
| Onshore wind project J408, Sanilac County Onshore wind |
200 MW | Withdrawn / abandoned |
| Gas project J397, Marquette County Gas |
153 MW | Withdrawn / abandoned |
| Onshore wind project J321, Sanilac County Onshore wind |
151 MW | Withdrawn / abandoned |
| Gas project J423, Wayne County Gas |
125 MW | Withdrawn / abandoned |
| Gas project J424, Wayne County Gas |
120 MW | Withdrawn / abandoned |
| Gas project J427, Livingston County Gas |
110 MW | Withdrawn / abandoned |
| Solar project J419, Washtenaw County Solar |
100 MW | Withdrawn / abandoned |
| Solar project J420, Washtenaw County Solar |
75.0 MW | Withdrawn / abandoned |
| Nuclear project J421, Monroe County Nuclear |
32.0 MW | Withdrawn / abandoned |
| Gas project J422, St. Clair County Gas |
30.0 MW | Withdrawn / abandoned |
| Other project J430, Marquette County Other |
26.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)