Interconnection queue in Massachusetts (2024 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown112,796 MW
Active in queue2,796 MW11 requests
Agreement signed0.0 MW0 requests
Withdrawn433,211 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery Storage
Battery storage
500 MWIn study Middlesex, MAISO-NE Jun 2024target 2028
Battery Storage
Battery storage
500 MWIn study Barnstable, MAISO-NE May 2024target 2028
Battery Storage
Battery storage
300 MWIn study Worcester, MAISO-NE Apr 2024target 2028
Battery Storage
Battery storage
290 MWIn study Berkshire, MAISO-NE Apr 2024target 2028
Battery Storage
Battery storage
225 MWIn study Essex, MAISO-NE Jun 2024target 2028
Battery Storage
Battery storage
200 MWIn study Essex, MAISO-NE Jun 2024target 2028
Battery Storage
Battery storage
180 MWIn study Worcester, MAISO-NE May 2024target 2028
Battery Storage
Battery storage
170 MWIn study Berkshire, MAISO-NE May 2024target 2029
Battery Storage
Battery storage
170 MWIn study Hampden, MAISO-NE May 2024target 2029
Battery Storage
Battery storage
136 MWIn study Berkshire, MAISO-NE Apr 2024target 2028
Battery Storage
Battery storage
125 MWIn study Middlesex, MAISO-NE Jun 2024target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)