United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Massachusetts (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown82,980 MW
Active in queue2,980 MW8 requests
Agreement signed2,475 MW6 requests
Withdrawn486,226 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
SouthCoast Wind 1
Offshore wind
1,200 MWAgreement signed MAISO-NE Apr 2021target 2031
Battery Storage
Battery storage
508 MWAgreement signed Middlesex, MAISO-NE Jun 2021target 2028
Offshore Wind Inc. (Q806)
Offshore wind
487 MWIn study MAISO-NE Mar 2021target 2032
Lite Brite Battery Storage
Battery storage
306 MWAgreement signed Suffolk, MAISO-NE Jul 2021target 2028
Hecate Energy Eastern Ave Energy Center
Battery storage
250 MWAgreement signed Suffolk, MAISO-NE Apr 2021target 2026
Norman Street Battery Storage
Battery storage
204 MWAgreement signed Middlesex, MAISO-NE Mar 2021target 2028
Offshore wind Inc (QP700)
Offshore wind
18.0 MWIn study MAISO-NE Aug 2021target 2026
Battery addition
Other
6.7 MWAgreement signed Franklin, MAISO-NE Aug 2021target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)