Interconnection queue in Maryland (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5451 MW
Active in queue451 MW5 requests
Agreement signed309 MW3 requests
Withdrawn48721 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Cherrywood Solar I
Solar
202 MWAgreement signed Caroline, MDPJM Feb 2016target 2026
Waypost Solar Project
Solar
92.0 MWPaused / redesign Caroline, MDPJM Feb 2016target 2026
Morgnec Road Solar
Solar
55.8 MWAgreement signed Kent, MDPJM Apr 2016target 2025
Egypt Road Solar
Solar
51.1 MWAgreement signed Dorchester, MDPJM Apr 2016target 2025
New Market Solar
Solar
50.0 MWPaused / redesign Dorchester, MDPJM Oct 2016target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)