United States βΊ Grid βΊ Interconnection queues βΊ Maryland
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Maryland (2017 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project AD2-004, Caroline County Gas |
600 MW | Withdrawn / abandoned |
| Solar project AC2-178, Frederick County Solar |
100 MW | Withdrawn / abandoned |
| Shugart Solar Solar |
32.5 MW | Withdrawn / abandoned |
| Pigtoe Bobcat Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AD2-029, Dorchester County Solar |
19.5 MW | Withdrawn / abandoned |
| Hydro project AC2-021, Garrett County Hydro |
15.0 MW | Withdrawn / abandoned |
| Other project AC2-189, Somerset County Other |
11.6 MW | Withdrawn / abandoned |
| Solar project AD1-153, Prince George's County Solar |
2.8 MW | Withdrawn / abandoned |
| Other project AD1-095, Wicomico County Other |
2.0 MW | Withdrawn / abandoned |
| Solar project AC2-160, Queen Anne's County Solar |
1.9 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)