πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Maryland

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Maryland (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5248 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn22349 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Wildcat Point
Gas
166 MWOperating Cecil, MDPJM Apr 20132017
Keys Energy Center
Gas
64.5 MWOperating Prince George's, MDPJM Aug 20132018
Rockfish Solar Power Plant
Solar
15.0 MWOperating Wicomico, MDPJM Mar 20132016
Rock Springs Units #1 & #2
Gas
2.0 MWOperating Cecil, MDPJM Aug 20132015
Hydro project Y3-074, Montgomery County
Hydro
0.4 MWOperating Montgomery, MDPJM Apr 20132014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)