United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Maine (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4294 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn4294 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Wind
Onshore wind
198 MWWithdrawn / abandoned Franklin, MEISO-NE Dec 2011target 2016
Wind
Onshore wind
79.9 MWWithdrawn / abandoned Oxford, MEISO-NE Dec 2011target 2014
Wind
Onshore wind
11.9 MWWithdrawn / abandoned Lincoln, MEISO-NE Nov 2011target 2017
Hydro
Hydro
3.9 MWWithdrawn / abandoned Penobscot, MEISO-NE Mar 2011target 2012

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)