OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Maine (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Western Maine Wind Project Onshore wind |
58.8 MW | |
| Riley-Jay-Otis-Livermore Hydro |
28.3 MW | |
| Bowman Street 115 kV SS - Augusta Area Study Solar + storage |
9.9 MW | |
| Bowman Street 115 kV SS - Augusta Area Study Solar + storage |
9.5 MW | |
| Augusta E. Side 115 kV SS - Augusta Area Study Solar + storage |
4.3 MW | |
| Augusta E. Side 115 kV SS - Augusta Area Study Solar |
4.0 MW | |
| Augusta E. Side 115 kV SS - Augusta Area Study Solar + storage |
3.8 MW | |
| Bowman Street 115 kV SS - Augusta Area Study Solar |
3.3 MW | |
| Rumford Power Repair for Performance Upgrade Gas |
0.2 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)