United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Kentucky (2025 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project AH1-644 Solar Β· Kentucky Power Company |
100 MW | Withdrawn / abandoned |
| Scotland Solar Solar Β· Scotland Solar, LLC |
100 MW | Withdrawn / abandoned |
| Solar project AH1-427 Solar Β· ACE Development Company, LLC |
100 MW | Withdrawn / abandoned |
| Solar project AG2-670, Green County Solar Β· Grayson Solar LLC |
75.0 MW | Withdrawn / abandoned |
| Solar + storage project AG2-159, Grant County Solar + storage Β· Round Trip, LLC |
61.0 MW | Withdrawn / abandoned |
| Solar + storage project AG2-179, Adair County Solar + storage Β· Round Trip, LLC |
60.0 MW | Withdrawn / abandoned |
| Battery storage project AG2-553, Bullitt County Battery storage Β· EDP Renewables North America LLC |
50.0 MW | Withdrawn / abandoned |
| Solar project AH1-136 Solar Β· Big Sandy Renewables, LLC |
20.0 MW | Withdrawn / abandoned |
| Solar project AH1-281, Nelson County Solar Β· Soltage KY DevCo, LLC |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)