πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Kentucky (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9586 MW
Active in queue4,487 MW34 requests
Agreement signed0.0 MW0 requests
Withdrawn9586 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project AH1-644
Solar Β· Kentucky Power Company
100 MWWithdrawn / abandoned KYPJM Feb 2025target 2026
Scotland Solar
Solar Β· Scotland Solar, LLC
100 MWWithdrawn / abandoned Barren, KYPJM Mar 2025target 2025
Solar project AH1-427
Solar Β· ACE Development Company, LLC
100 MWWithdrawn / abandoned KYPJM Mar 2025target 2026
Solar project AG2-670, Green County
Solar Β· Grayson Solar LLC
75.0 MWWithdrawn / abandoned Green, KYPJM Mar 2025target 2023
Solar + storage project AG2-159, Grant County
Solar + storage Β· Round Trip, LLC
61.0 MWWithdrawn / abandoned Grant, KYPJM Mar 2025target 2023
Solar + storage project AG2-179, Adair County
Solar + storage Β· Round Trip, LLC
60.0 MWWithdrawn / abandoned Adair, KYPJM Mar 2025target 2023
Battery storage project AG2-553, Bullitt County
Battery storage Β· EDP Renewables North America LLC
50.0 MWWithdrawn / abandoned Bullitt, KYPJM Mar 2025target 2024
Solar project AH1-136
Solar Β· Big Sandy Renewables, LLC
20.0 MWWithdrawn / abandoned KYPJM Mar 2025target 2024
Solar project AH1-281, Nelson County
Solar Β· Soltage KY DevCo, LLC
20.0 MWWithdrawn / abandoned Nelson, KYPJM Mar 2025target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)