SOLAR Β· PJMSolar project AH1-281, Nelson County
Solar project AH1-281, Nelson County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Nelson County, Kentucky, connecting to EKPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-281
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Developer
- Soltage KY DevCo, LLC
- Connection point (POI)
- Bluegrass Parkway Tap - Woodlawn 69 kV
- Location
- Nelson County, Kentucky
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 18 March 2025
- Proposed online date
- June 2024
- Withdrawn
- December 2025
Location
Marker shows the centre of Nelson County; the queue data does not give exact sites.
Other requests in Nelson County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem