United States β€Ί Grid β€Ί Interconnection queues β€Ί Kansas

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Kansas (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown112,277 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn112,277 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project GEN-2015-051, Lyon County
Gas
916 MWWithdrawn / abandoned Lyon, KSSPP Oct 2015target 2019
Gas project GEN-2015-050, Lyon County
Gas
464 MWWithdrawn / abandoned Lyon, KSSPP Oct 2015target 2019
Onshore wind project GEN-2015-061, Logan County
Onshore wind
200 MWWithdrawn / abandoned Logan, KSSPP Oct 2015target 2018
Onshore wind project GEN-2015-074, Nemaha County
Onshore wind
174 MWWithdrawn / abandoned Nemaha, KSSPP Sep 2015target 2017
Gas project GEN-2015-017, Thomas County
Gas
172 MWWithdrawn / abandoned Thomas, KSSPP Mar 2015target 2018
Gas project GEN-2015-011, Thomas County
Gas
172 MWWithdrawn / abandoned Thomas, KSSPP Mar 2015target 2018
Onshore wind project GEN-2015-083, Sumner County
Onshore wind
125 MWWithdrawn / abandoned Sumner, KSSPP Sep 2015target 2017
Solar project GEN-2015-072, Ellis County
Solar
20.9 MWWithdrawn / abandoned Ellis, KSSPP Oct 2015target 2018
Battery storage project GEN-2015-043, Pratt County
Battery storage
20.0 MWWithdrawn / abandoned Pratt, KSSPP Oct 2015target 2017
Onshore wind project GEN-2015-026, Gray County
Onshore wind
8.3 MWWithdrawn / abandoned Gray, KSSPP Apr 2015target 2016
Onshore wind project GEN-2015-027, Gray County
Onshore wind
4.9 MWWithdrawn / abandoned Gray, KSSPP Apr 2015target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)