ONSHORE WIND Β· SPPOnshore wind project GEN-2015-061, Logan County
Onshore wind project GEN-2015-061, Logan County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Logan County, Kansas, connecting to SUNC.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2015 (completed)
- Withdrawn / abandonedMay 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2015-061
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SUNC
- Connection point (POI)
- Mingo 345kV
- Location
- Logan County, Kansas
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 6 October 2015
- Proposed online date
- December 2018
- Withdrawn
- May 2017
Location
Marker shows the centre of Logan County; the queue data does not give exact sites.