United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

OCTARY USA Β· INTERCONNECTION QUEUES

Other interconnection queue in Iowa

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6463 MW
Active in queue463 MW6 requests
Agreement signed11.0 MW2 requests
Withdrawn2910.7 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Replacing 30 MW of existing coal generation with BESS at Burlington Generation Station; Burlington 5
Other
212 MWIn study Des Moines, IAMISO Feb 2022target 2024
Surplus; J1734
Other
120 MWIn study Lee, IAMISO Nov 2024target 2025
Surplus; Old Gold
Other
80.0 MWIn study Worth, IAMISO Jun 2024target 2029
Surplus; J1132
Other
40.0 MWIn study Union, IAMISO target 2025
Other project J963, Cedar County
Other
9.0 MWAgreement signed Cedar, IAMISO Mar 2018target 2017
Other project J953, Johnson County
Other
2.0 MWAgreement signed Johnson, IAMISO Mar 2018target 2006

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)