Requests shown344.0 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn51,959 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Rockport Unit #1
Coal
36.0 MWOperating Spencer, INPJM Feb 20132017
Wabash Valley Power Association, Inc.
Other
4.8 MWOperating Elkhart, INPJM Jan 20132015
Wabash Valley Power Association, Inc.
Other
3.2 MWOperating Jay, INPJM Jan 20132015

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)