πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Illinois (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown101,426 MW
Active in queue1,426 MW10 requests
Agreement signed0.0 MW0 requests
Withdrawn496,216 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

10 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Wind + storage project J2128, Coles County
Wind + storage
300 MWIn study Coles, ILMISO Aug 2021target 2026
Onshore wind project J1701, Mcdonough County
Onshore wind
200 MWIn study Mcdonough, ILMISO Dec 2021target 2026
Solar project J2033, Clay County
Solar
200 MWIn study Clay, ILMISO Aug 2021target 2024
Solar project J2131, Jasper County
Solar
150 MWIn study Jasper, ILMISO Aug 2021target 2027
Solar + storage project J2151, Saline County
Solar + storage
150 MWIn study Saline, ILMISO Aug 2021target 2025
Solar project J1653, Tazewell County
Solar
150 MWIn study Tazewell, ILMISO Dec 2021target 2026
Battery storage project AH2-015, Lee County
Battery storage
110 MWIn study Lee, ILPJM Oct 2021target 2025
Battery storage project J2124, Champaign County
Battery storage
100 MWIn study Champaign, ILMISO Aug 2021target 2022
Battery storage project J2159, Clark County
Battery storage
50.0 MWIn study Clark, ILMISO Aug 2021target 2024
Onshore wind project J2189, Mcdonough County
Onshore wind
15.6 MWIn study Mcdonough, ILMISO Aug 2021target 2019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)