United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Illinois (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5577 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn5577 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project J277, Iroquois County
Onshore wind
150 MWWithdrawn / abandoned Iroquois, ILMISO Mar 2013target 2014
Wind + storage project J276, Iroquois County
Wind + storage
150 MWWithdrawn / abandoned Iroquois, ILMISO Mar 2013target 2014
Onshore wind project J273, Dewitt County
Onshore wind
150 MWWithdrawn / abandoned Dewitt, ILMISO Mar 2013
Onshore wind project Y3-035, Marshall County
Onshore wind
97.5 MWWithdrawn / abandoned Marshall, ILPJM Feb 2013target 2015
Onshore wind project J318, Morgan County
Onshore wind
30.0 MWWithdrawn / abandoned Morgan, ILMISO Dec 2013target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)