United States β€Ί Grid β€Ί Interconnection queues β€Ί Idaho

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Idaho (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2455 MW
Active in queue455 MW2 requests
Agreement signed455 MW2 requests
Withdrawn113,057 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Other project 590, Elmore County
Other Β· Appaloosa Wind And Solar LLC
330 MWAgreement signed Elmore, IDWest Dec 2020target 2027
Solar project 588, Ada County
Solar Β· PVS 2, LLC
125 MWAgreement signed Ada, IDWest Sep 2020target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)