United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Florida (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown121,618 MW
Active in queue1,303 MW9 requests
Agreement signed630 MW2 requests
Withdrawn121,618 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

12 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 420, St Johns County
Gas Β· Third Party
744 MWWithdrawn / abandoned St Johns, FLSoutheast Mar 2021target 2027
Gas project 82, Hillsborough County
Gas
186 MWWithdrawn / abandoned Hillsborough, FLSoutheast Nov 2021target 2023
Solar project 80, Hillsborough County
Solar
74.9 MWWithdrawn / abandoned Hillsborough, FLSoutheast Jun 2021target 2024
Solar project 291, Wakulla County
Solar Β· Duke Energy Florida, LLC
74.9 MWWithdrawn / abandoned Wakulla, FLSoutheast Apr 2021target 2023
Solar project 78, Hillsborough County
Solar
74.9 MWWithdrawn / abandoned Hillsborough, FLSoutheast Jun 2021target 2024
Solar project 79, Hillsborough County
Solar
74.9 MWWithdrawn / abandoned Hillsborough, FLSoutheast Jun 2021target 2024
Solar project 294, Gilchrist County
Solar Β· Duke Energy Florida, LLC
74.9 MWWithdrawn / abandoned Gilchrist, FLSoutheast Sep 2021target 2023
Solar project 81, Hillsborough County
Solar
74.9 MWWithdrawn / abandoned Hillsborough, FLSoutheast Jun 2021target 2024
Solar project 299, Manatee County
Solar Β· Masked
74.5 MWWithdrawn / abandoned Manatee, FLSoutheast Dec 2021target 2024
Solar project 298, Manatee County
Solar Β· Masked
74.5 MWWithdrawn / abandoned Manatee, FLSoutheast Dec 2021target 2026
Solar project 423, St. Lucie County
Solar Β· FPL
74.5 MWWithdrawn / abandoned St. Lucie, FLSoutheast May 2021target 2028
Solar project 421, Baker County
Solar Β· FPL
14.5 MWWithdrawn / abandoned Baker, FLSoutheast Mar 2021target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)