Withdrawn queue requests in Florida (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown8715 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn8715 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Other project 125, Suwannee County
Other Β· Duke Energy Florida, LLC
188 MWWithdrawn / abandoned Suwannee, FLSoutheast Oct 2013target 2016
Other project 126, Suwannee County
Other Β· Duke Energy Florida, LLC
187 MWWithdrawn / abandoned Suwannee, FLSoutheast Oct 2013target 2016
Gas project 8
Gas
180 MWWithdrawn / abandoned FLSoutheast Feb 2013target 2015
Other project 120, Lake County
Other Β· Masked
110 MWWithdrawn / abandoned Lake, FLSoutheast Jun 2013target 1993
Other project 122, Lake County
Other Β· Masked
15.7 MWWithdrawn / abandoned Lake, FLSoutheast Aug 2013target 1990
Other project 121, Osceola County
Other Β· Masked
11.8 MWWithdrawn / abandoned Osceola, FLSoutheast Jul 2013target 2014
Other project 128, Suwannee County
Other Β· Duke Energy Florida, LLC
11.7 MWWithdrawn / abandoned Suwannee, FLSoutheast Dec 2013target 2015
Other project 127, Lake County
Other Β· Masked
11.0 MWWithdrawn / abandoned Lake, FLSoutheast Oct 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)