United States β€Ί Grid β€Ί Interconnection queues β€Ί Delaware

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Delaware (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown590.0 MW
Active in queue90.0 MW5 requests
Agreement signed50.0 MW3 requests
Withdrawn558.8 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Cedar Creek Solar
Solar
20.0 MWPaused / redesign Kent, DEPJM Apr 2017target 2027
Cedar Creek Solar
Solar
20.0 MWPaused / redesign Kent, DEPJM Apr 2017target 2027
Raceway Solar
Solar
20.0 MWAgreement signed Kent, DEPJM Mar 2017target 2025
Raceway Solar
Solar
20.0 MWAgreement signed Kent, DEPJM Mar 2017target 2025
Raceway Solar
Solar
10.0 MWAgreement signed Kent, DEPJM Apr 2017target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)