United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Connecticut (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown51,872 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn51,872 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Combined Cycle
Gas
1,120 MWWithdrawn / abandoned Windham, CTISO-NE Feb 2016target 2020
Combined Cycle
Gas
563 MWWithdrawn / abandoned Windham, CTISO-NE Mar 2016target 2022
Combustion Turbine
Gas
102 MWWithdrawn / abandoned Fairfield, CTISO-NE Apr 2016target 2019
Solar
Solar
63.0 MWWithdrawn / abandoned Windham, CTISO-NE Jun 2016target 2018
Gas Turbine Upgrade
Other
23.5 MWWithdrawn / abandoned New Haven, CTISO-NE Apr 2016target 2020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)