Requests shown463.8 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn92,905 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gravel Pit Solar Increase
Solar
45.0 MWOperating Hartford, CTISO-NE Jun 2020target 2024
Fuel Cell
Gas
14.4 MWOperating New Haven, CTISO-NE Aug 2020target 2023
Combined Cycle Upgrade
Gas
4.0 MWOperating Fairfield, CTISO-NE Mar 2020target 2021
Bridgeport Harbor Unit #5 Uprate
Gas
0.4 MWOperating Fairfield, CTISO-NE Mar 2020target 2021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)