Completed queue projects in California (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown92,161 MW
Active in queue4,783 MW20 requests
Agreement signed4,721 MW18 requests
Withdrawn7120.4 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Rexford Solar Farm
Solar + storage
540 MWOperating Tulare, CACAISO Apr 20182025
Dallas Energy Storage
Battery storage
500 MWOperating Monterey, CACAISO Apr 20182021
Panoche Energy Center C11
Gas
427 MWOperating Fresno, CACAISO Apr 20182024
Bateria Del Sur
Battery storage
350 MWOperating Imperial, CACAISO Apr 20182025
Quartzite Solar 11
Solar + storage
225 MWOperating Riverside, CACAISO Apr 20182024
Caballero Storage
Battery storage
106 MWOperating San Luis Obispo, CACAISO Apr 20182025
Wind Wall Monolith 1
Onshore wind
5.0 MWOperating CACAISO Apr 20182021
Hydro project 1055, Shasta County
Hydro Β· Slate Creek Hydro Associates LP
4.2 MWOperating Shasta, CAWest Jul 2018target 2020
Wind Wall Monolith 2
Onshore wind
3.7 MWOperating Kern, CACAISO Apr 20182021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)