United States βΊ Grid βΊ Interconnection queues βΊ California
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in California (2018 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Rexford Solar Farm Solar + storage |
540 MW | |
| Dallas Energy Storage Battery storage |
500 MW | |
| Panoche Energy Center C11 Gas |
427 MW | |
| Bateria Del Sur Battery storage |
350 MW | |
| Quartzite Solar 11 Solar + storage |
225 MW | |
| Caballero Storage Battery storage |
106 MW | |
| Wind Wall Monolith 1 Onshore wind |
5.0 MW | |
| Hydro project 1055, Shasta County Hydro Β· Slate Creek Hydro Associates LP |
4.2 MW | |
| Wind Wall Monolith 2 Onshore wind |
3.7 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)