Completed queue projects in California (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown91,239 MW
Active in queue4,195 MW17 requests
Agreement signed3,820 MW15 requests
Withdrawn6511.4 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Edsan 2
Solar + storage
553 MWOperating Kern, CACAISO May 20172023
Sandrini Sol 2
Solar
200 MWOperating Kern, CACAISO May 20172024
Elkhorn Energy Storage
Battery storage
189 MWOperating Monterey, CACAISO May 20172022
High 5 Solar
Solar + storage
150 MWOperating San Bernardino, CACAISO May 20172021
Mountainview Generating Station Pmax Increase
Gas
38.0 MWOperating San Bernardino, CACAISO May 20172019
Paulsell Solar Energy Center
Solar + storage
35.0 MWOperating Stanislaus, CACAISO May 20172024
Top Gun Energy Storage
Battery storage
30.0 MWOperating San Diego, CACAISO May 20172021
West Ford Flat Energy Storage
Battery storage
26.3 MWOperating Lake, CACAISO May 20172024
Pio Pico Plus
Gas
18.0 MWOperating CACAISO Feb 20172017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)