United States β€Ί Grid β€Ί Interconnection queues β€Ί California

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in California (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6540 MW
Active in queue210 MW2 requests
Agreement signed40.0 MW1 requests
Withdrawn6012.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
California Flats Solar
Solar + storage
340 MWOperating Monterey, CACAISO Apr 20122019
Solar project Q40, Kern County
Solar
100 MWOperating Kern, CAWest Nov 20122024
Pastoria Energy Facility
Gas
50.0 MWOperating Kern, CACAISO Apr 20122016
Mojave Solar
Solar
25.0 MWOperating San Bernardino, CACAISO Apr 20122015
Wildwood Solar 2
Solar
15.0 MWOperating Kern, CACAISO Apr 20122017
Skic Solar
Solar
10.0 MWOperating Kern, CACAISO Apr 20122017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)