πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Arkansas (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown81,250 MW
Active in queue1,250 MW8 requests
Agreement signed200 MW1 requests
Withdrawn7568 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1710, Lee County
Solar
300 MWIn study Lee, ARMISO Jun 2020target 2026
Solar project J1559, Conway County
Solar
200 MWUnder construction Conway, ARMISO Jun 2020target 2026
Solar project J1562, Mississippi County
Solar
200 MWAgreement signed Mississippi, ARMISO Jun 2020target 2025
Solar project J1558, Pope County
Solar
200 MWIn study Pope, ARMISO Jun 2020target 2026
Solar project J1820, Lee County
Solar
100 MWIn study Lee, ARMISO Jun 2020target 2026
Solar project J1577, Grant County
Solar
100 MWIn study Grant, ARMISO Jun 2020target 2025
Solar project J1612, Union County
Solar
100 MWIn study Union, ARMISO Jun 2020target 2024
Solar project J1670, Mississippi County
Solar
50.0 MWIn study Mississippi, ARMISO Jun 2020target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)