United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Arkansas (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5755 MW
Active in queue755 MW5 requests
Agreement signed575 MW4 requests
Withdrawn151,774 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1415, Lonoke County
Solar
250 MWAgreement signed Lonoke, ARMISO Apr 2019target 2024
Solar project J1215, Arkansas County
Solar
200 MWAgreement signed Arkansas, ARMISO Apr 2019target 2024
Onshore wind project J1437, Carroll County
Onshore wind
180 MWUnder construction Carroll, ARMISO Apr 2019target 2024
Solar project J1281, Ashley County
Solar
75.0 MWAgreement signed Ashley, ARMISO Apr 2019target 2024
Solar project J1258, Lonoke County
Solar
50.0 MWAgreement signed Lonoke, ARMISO Apr 2019target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)