United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Arkansas (2014 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project J368, Lee County Solar |
200 MW | Withdrawn / abandoned |
| Solar project J380, Lee County Solar |
199 MW | Withdrawn / abandoned |
| Solar project J387, Independence County Solar |
103 MW | Withdrawn / abandoned |
| Solar project J386, Lonoke County Solar |
103 MW | Withdrawn / abandoned |
| Solar project J379, Lee County Solar |
79.1 MW | Withdrawn / abandoned |
| Solar project J378, Lonoke County Solar |
79.1 MW | Withdrawn / abandoned |
| Solar project J350, Chicot County Solar |
50.0 MW | Withdrawn / abandoned |
| Solar project J370, Jackson County Solar |
50.0 MW | Withdrawn / abandoned |
| Solar project J393, Arkansas County Solar |
49.0 MW | Withdrawn / abandoned |
| Solar project J377, Bradley County Solar |
40.0 MW | Withdrawn / abandoned |
| Solar project J347, Craighead County Solar |
30.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)