United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Arkansas (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown11982 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn11982 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J368, Lee County
Solar
200 MWWithdrawn / abandoned Lee, ARMISO May 2014target 2016
Solar project J380, Lee County
Solar
199 MWWithdrawn / abandoned Lee, ARMISO Jul 2014
Solar project J387, Independence County
Solar
103 MWWithdrawn / abandoned Independence, ARMISO Sep 2014target 2016
Solar project J386, Lonoke County
Solar
103 MWWithdrawn / abandoned Lonoke, ARMISO Sep 2014
Solar project J379, Lee County
Solar
79.1 MWWithdrawn / abandoned Lee, ARMISO Jul 2014
Solar project J378, Lonoke County
Solar
79.1 MWWithdrawn / abandoned Lonoke, ARMISO Jul 2014
Solar project J350, Chicot County
Solar
50.0 MWWithdrawn / abandoned Chicot, ARMISO May 2014
Solar project J370, Jackson County
Solar
50.0 MWWithdrawn / abandoned Jackson, ARMISO Jun 2014
Solar project J393, Arkansas County
Solar
49.0 MWWithdrawn / abandoned Arkansas, ARMISO Sep 2014
Solar project J377, Bradley County
Solar
40.0 MWWithdrawn / abandoned Bradley, ARMISO Jul 2014
Solar project J347, Craighead County
Solar
30.0 MWWithdrawn / abandoned Craighead, ARMISO May 2014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)