United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Arkansas (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4500 MW
Active in queue453 MW3 requests
Agreement signed72.5 MW1 requests
Withdrawn151,300 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J907, Monroe County
Solar
200 MWOperating Monroe, ARMISO Jun 20172022
Solar project J893, White County
Solar
100 MWOperating White, ARMISO Jun 20172021
Solar project J834, Phillips County
Solar
100 MWOperating Phillips, ARMISO Jun 20172021
Solar project J663, Phillips County
Solar
100 MWOperating Phillips, ARMISO Jun 20172022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)