United States β€Ί Grid β€Ί Interconnection queues β€Ί Alabama

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Alabama (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4967 MW
Active in queue967 MW4 requests
Agreement signed780 MW1 requests
Withdrawn477,641 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 416, Colbert County
Gas
780 MWAgreement signed Colbert, ALSoutheast Feb 2020target 2022
Solar + storage project IC-925, Houston County
Solar + storage
80.0 MWPaused / redesign Houston, ALSoutheast Dec 2020target 2027
Solar project IC-926, Montgomery County
Solar
80.0 MWPaused / redesign Montgomery, ALSoutheast Dec 2020target 2027
Gas project IC-1012, Autauga County
Gas
27.0 MWIn study Autauga, ALSoutheast Oct 2020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)