United States β€Ί Grid β€Ί Interconnection queues β€Ί Alabama

OCTARY USA Β· INTERCONNECTION QUEUES

Gas interconnection queue in Alabama

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown134,349 MW
Active in queue4,349 MW13 requests
Agreement signed780 MW1 requests
Withdrawn5030.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

13 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 416, Colbert County
Gas
780 MWAgreement signed Colbert, ALSoutheast Feb 2020target 2022
Gas project 25-IC-1382, Mobile County
Gas
707 MWIn study Mobile, ALSoutheast Apr 2025target 2031
Gas project IC-1158, Mobile County
Gas
685 MWPaused / redesign Mobile, ALSoutheast Aug 2023target 2028
Gas project 25RSC-011, Morgan County
Gas
528 MWIn study Morgan, ALSoutheast Aug 2025target 2031
Gas project IC-1160, Shelby County
Gas
403 MWPaused / redesign Shelby, ALSoutheast Aug 2023target 2030
Gas project IC-1159, Shelby County
Gas
403 MWPaused / redesign Shelby, ALSoutheast Aug 2023target 2030
Gas project 25-IC-1320A, Lee County
Gas
240 MWIn study Lee, ALSoutheast Apr 2025target 2029
Gas project 25-IC-1317, Autauga County
Gas
229 MWIn study Autauga, ALSoutheast Apr 2025target 2029
Gas project 25-IC-1321, Lee County
Gas
111 MWIn study Lee, ALSoutheast Apr 2025target 2029
Gas project 25-IC-1318, Autauga County
Gas
111 MWIn study Autauga, ALSoutheast Apr 2025target 2031
Gas project 25-IC-1319, Autauga County
Gas
111 MWIn study Autauga, ALSoutheast Apr 2025target 2032
Gas project IC-1012, Autauga County
Gas
27.0 MWIn study Autauga, ALSoutheast Oct 2020
Gas project 25-IC-1344, Mobile County
Gas
14.0 MWIn study Mobile, ALSoutheast Apr 2025target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)