United States βΊ Grid βΊ Interconnection queues βΊ Alabama
OCTARY USA Β· INTERCONNECTION QUEUESGas interconnection queue in Alabama
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project 416, Colbert County Gas |
780 MW | Agreement signed |
| Gas project 25-IC-1382, Mobile County Gas |
707 MW | In study |
| Gas project IC-1158, Mobile County Gas |
685 MW | Paused / redesign |
| Gas project 25RSC-011, Morgan County Gas |
528 MW | In study |
| Gas project IC-1160, Shelby County Gas |
403 MW | Paused / redesign |
| Gas project IC-1159, Shelby County Gas |
403 MW | Paused / redesign |
| Gas project 25-IC-1320A, Lee County Gas |
240 MW | In study |
| Gas project 25-IC-1317, Autauga County Gas |
229 MW | In study |
| Gas project 25-IC-1321, Lee County Gas |
111 MW | In study |
| Gas project 25-IC-1318, Autauga County Gas |
111 MW | In study |
| Gas project 25-IC-1319, Autauga County Gas |
111 MW | In study |
| Gas project IC-1012, Autauga County Gas |
27.0 MW | In study |
| Gas project 25-IC-1344, Mobile County Gas |
14.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)