Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown121,645 MW
Active in queue5,137 MW29 requests
Agreement signed0.0 MW0 requests
Withdrawn121,645 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

12 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 25-IC-1378, Sumter County
Solar
199 MWWithdrawn / abandoned Sumter, ALSoutheast Apr 2025
Solar project 25-IC-1367, Macon County
Solar
195 MWWithdrawn / abandoned Macon, ALSoutheast Apr 2025
Solar project 25-IC-1362, Marengo County
Solar
195 MWWithdrawn / abandoned Marengo, ALSoutheast Apr 2025
Solar + storage project 25-IC-1351, Barbour County
Solar + storage
190 MWWithdrawn / abandoned Barbour, ALSoutheast Apr 2025
Solar project 25-IC-1345, Baldwin County
Solar
160 MWWithdrawn / abandoned Baldwin, ALSoutheast Apr 2025
Solar project 25-IC-1381, Sumter County
Solar
156 MWWithdrawn / abandoned Sumter, ALSoutheast Apr 2025
Solar + storage project 25-IC-1352, Henry County
Solar + storage
148 MWWithdrawn / abandoned Henry, ALSoutheast Apr 2025
Solar + storage project 25-IC-1353, Mobile County
Solar + storage
112 MWWithdrawn / abandoned Mobile, ALSoutheast Apr 2025
Solar project 25-IC-1371, Montgomery County
Solar
80.0 MWWithdrawn / abandoned Montgomery, ALSoutheast Apr 2025
Solar project 25-IC-1369, Montgomery County
Solar
80.0 MWWithdrawn / abandoned Montgomery, ALSoutheast Apr 2025
Gas project 25-IC-1295, Mobile County
Gas
65.0 MWWithdrawn / abandoned Mobile, ALSoutheast Mar 2025
Gas project 25-IC-1296, Mobile County
Gas
65.0 MWWithdrawn / abandoned Mobile, ALSoutheast Mar 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)